Previous Council Item

Next Council Item Corresponding Agenda
List of Council Meetings List of Reports to Council Sunnyvale Home Page

 

RTC #99-437

October 19, 1999

 

SUBJECT: Award of Contract -- Painting of Water Tank – Mary-Carson Reservoir No. 2 Project, (UW-98-01)

REPORT IN BRIEF

On September 29, 1999, the City opened the five bids received for the Painting of Water Tank – Mary-Carson Reservoir No. 2 Project. Staff is recommending award of the contract to the lowest responsible bidder, Blair & Sons, Inc., in the amount of $82,850.

BACKGROUND

The program to paint the water tanks at the Hamilton and Mary-Carson pump stations involves external recoating of water storage tanks as required by a tank maintenance schedule created nine years ago. The program, spread over two fiscal years, required recoating three 500,000 gallon water tanks at the Hamilton Pump Station (Phase 1) and one 5,000,000 gallon water tank at the Mary-Carson Pump Station (Phase 2). The Phase 1 work has been completed.

DISCUSSION

The Phase 2 project involves surface preparation and applying paint to the exterior surface of one 5,000,000 gallon water tank at the Mary-Carson Pump Station site.

For comparative purposes, the Engineer’s Estimate and the bids received are:

   

Bid

 

Engineer’s Estimate

$ 60,000

     

1.

Blair & Sons, Inc.

82,850

2.

Redwood Painting Co., Inc.

86,400

3.

Robison-Prezioso, Inc.

89,900

4.

Services Alliance Systems, Inc.

149,500

5.

ITEQ Storage Systems

149,500

The discrepancy between the Engineer’s Estimate and the lowest bid is mainly due to the exclusion by the Engineer of the cost for blast cleaning and priming of the lower eight feet of the tank. The closeness of the three lowest bids convinced staff that the bids are competitive and consistent with the work specified. Staff, having reviewed the references and bids, has determined that Blair & Sons, Inc., is the lowest responsible bidder.

This project is categorically exempt (Class 1) from CEQA environmental reviews as it involves operation, repair, maintenance, or minor alteration of an existing structure of facility not expanding existing use.

Staff recommends acceptance of the low bid and award of the construction contract to Blair & Sons, Inc.

FISCAL IMPACT

1. Project Costs
a. Construction
82,850

b. Construction Contingency (15% of Construction)

12,400 

c. Consultant

6,180

d. Direct Expenses (testing, etc.)

2,000
Total Cost $103,430
2. Project Budget
Funds for this project are included in the carryover from Charge Number 817600, Painting of Water Tanks. There are sufficient funds to perform the project.

PUBLIC CONTACT

Posting of the Council Agenda. This report is also available on the City’s Internet home page and at the City Library.

RECOMMENDATION

It is recommended that the City Council award the contract for the subject project to the lowest qualified bidder, Blair & Sons, Inc., in the amount of $82,850 and approve a contingency amount of $12,400.

 

 

Prepared by:

 

Hira R. Raina
Assistant City Engineer

 

Reviewed by:

 

Marvin A. Rose
Director of Public Works

 

 

Reviewed by:

 

Mary Bradley
Director of Finance

 

 

Approved by:

Robert S. LaSala
City Manager

Previous Council Item

Next Council Item Corresponding Agenda
List of Council Meetings List of Reports to Council Sunnyvale Home Page